Factory  High Quality Price Ratio  direct sale transmission sprocket 45C zincing chain sprocket roller chain plate wheel

If you require any data or samples, make sure you make contact with us and you will have our shortly reply.

Overview

Quick Information

Applicable Industries:

Lodges, Garment Retailers, Constructing Substance Outlets, Production Plant, Machinery Restore Retailers, Meals & Beverage Factory, Farms, Cafe, Residence Use, Retail, Food Store, Printing Retailers, Building works , Energy & Mining, Food & Beverage Shops, Marketing Organization

Substance:

Steel

Standard:

ISO

Spot of Origin:Zhejiang, China
Brand name Title:

OEM

Item title:

transmission sprocket 45C zincing chain sprocket

Colour:

Blue Zinc

Packing:

Plastic Bag + Plywood Scenario

Surface treatment:

Zinc

OEM:

Assist

Enamel:

17T

Source Potential

Supply Capability:
3000000000000 Unit/Units per Thirty day period

Packaging & Delivery

Packaging Particulars
plastic bag+plywood box+according to customers’ demands
Port
HangZhou or Ningbo
Image Instance:

Direct Time
:
Amount(Items) 1 – a thousand >1000
Est. Time(days) 45 To be negotiated

On the web Customization

Video clip Description

 

 

one Materials

 

C45(1.0503),SS304(one.4517),SS316(one.4541),Q235(S235JR),Q345,C20,40Cr,POM,PA6,Aluminum,GG25, Qt900-2,qt600-three,qt800-two,qt500-seven,9cr18mov,qt400-fifteen,20CRMNTI,42CRMO,Brass(Copper)

—SPROCKETS/GEARS/CNC MACHINING Parts/BUSHINGS/SHAFTS/PULLEYS/COUPLINGS
40Cr,40MN,45MN,65Mn,SS304(one.4517),Rubber—Chains

 

two Tailored

Drawing as normal or accredited by customer just before production

3 Standard

ANSI ,ASA,DIN ,JIS ,BS, ( SATI, CHIARAVALLI, BEA,MARTIN, BROWNING,KANA)

four Warmth Remedy

Harden enamel, Carburizing and Quenching,Fuel Nitriding

5 Suface Treatment method

 

Black Oxide, Black phosphating, Nickel plating,Chromium plating,Copper Passivation

6

 

Procedure

 

Forging( casting)—lathe- enamel shaping—finishing—oil washing—Packing ,made by CNC equipment

7 Inspection

 

All products are checked and tested completely for the duration of each and every functioning method and after the product is lastly manufactured to ensure that the best good quality item enter into the industry.

 

eight Purpose

Sturdy, bad problem Resistance

9 Supply Time In inventory or about 30-50 Days times